MEPCO New Connection Demand Notice Fee 2026 – Full Guide
What is a MEPCO Demand Notice?
After you apply for a new MEPCO electricity connection and the site survey is completed, MEPCO issues a Demand Notice. This document specifies the total charges you must pay before MEPCO will install your meter and establish your electricity connection.
What is Included in the MEPCO Demand Notice Fee?
The demand notice typically includes:
- Service Connection Charges: Cost of cable from the nearest pole to your meter
- Meter Installation Charges: Cost of the electricity meter
- Security Deposit: Refundable deposit based on estimated consumption
- Processing Fee: Administrative charges
- Infrastructure Charges: If new poles or transformer capacity is required
- Wiring from pole to premises: Based on distance in meters
How is the Demand Notice Amount Calculated?
The main variable in demand notice calculation is the distance from the nearest MEPCO electricity pole to your premises. The longer the cable required, the higher the demand notice amount. Other factors include:
- Type of cable required (overhead vs underground)
- Current MEPCO material cost schedule
- Any new infrastructure needed
- Your requested load (kW)
Typical Demand Notice Fee Ranges (2026)
- Very close to existing pole (under 30m): Rs. 5,000–15,000
- 30–100 meters from pole: Rs. 15,000–40,000
- Over 100 meters: Rs. 40,000+ (can go much higher)
- These are estimates — actual amount depends on MEPCO survey
How to Pay the MEPCO Demand Notice
- Receive the demand notice from MEPCO Sub-Division office
- Pay the specified amount at any HBL bank branch using the demand notice number
- Or pay through specific payment channels listed on the notice
- Bring your payment receipt back to the MEPCO office
- MEPCO will schedule your connection within the promised timeframe
Is the Security Deposit Refundable?
Yes. The security deposit component of the demand notice is refundable when you permanently disconnect your MEPCO connection in future. The connection and infrastructure charges are not refundable.
Frequently Asked Questions (FAQ)
Q: Can I negotiate the demand notice amount?
A: The charges are calculated based on MEPCO's approved rate schedule and actual material costs. However, if you believe the calculation contains errors, you can request a re-calculation at the Sub-Division office.
Q: Is there a time limit to pay the demand notice?
A: Demand notices typically have a validity period. If you do not pay within the specified time (usually 30–60 days), you may need to re-apply and get a new survey done.
Q: What happens to the demand notice fee if my connection is cancelled?
A: If MEPCO cancels the connection through no fault of yours, you are entitled to a full refund. If you cancel voluntarily, the security deposit is refundable but processing fees may not be.